Cayton Excavation, Inc. was heavily involved with the design and value engineering of this project. We also managed installation of the synthetic turf field and rubber track.
Acreage: 5.58
- Demolition of existing grass football field and gravel track.
- 8700 Cubic yards of cut/fill and export
- 57,500 square foot of track prep and installation
- 80,542 square feet of field prep and synthetic turf installation
- 3,248 lineal feet of concrete curb
- 3.850 lineal feet of storm drain installation
- Field event installation including long jump, pole vault, shot put, and discus